Project Summary:
Please see ALL attachments- Letter to Pre-Qualified Bidders The Project is a 3-4 story approximately 65,000-square-foot student dormitory housing facility offering around 300 beds. The project consists of two wings connected by a central hub. The central hub contains a small amount of Cross Laminated Timber (CLT). Construction consists of student dormitory rooms, common areas, restrooms, utility rooms, stairwells, community kitchens, community study rooms, one professional staff apartment, central laundry services, professional staff offices, and support spaces. Interiors include student rooms, community kitchens, study rooms central restrooms and showers, corridors, elevators, fire-rated walls, and ceiling assemblies. Sitework improvements include grading, geogrid, retaining walls, fences throughout, shade structures, landscaping, hardscape, irrigation, site furniture, fire lane, demolition of an existing parking lot and construction of a new, approximately 100 vehicle, parking lot with lighting and miscellaneous site utilities. The exterior finishes include exterior cement board, stucco, aluminum window system and fiberglass window system.
The project is under the jurisdiction of the Division of the State Architect (DSA). Estimated construction cost is $59.4 million; estimated construction duration is 24 months.
The work is anticipated to begin on or about January 4, 2027.
Bid Packet:
Opening
- Date: Thu, 12/10/2026
- Time: 2:00 pm
- Location: District Administrative Center
Mandatory Job Walk
- Date: Fri, 10/23/2026
- Time: 1:00 pm
- Location: Ventura College Campus Center Conference Room in CSC (Campus Student Center) Bldg.
- Phone #:
- License:
- Attachments:
Recommended Vendor
- Recommended Vendor:
- Recommendation Date:
- Bid will Be Awarded:
- Notes: