Project Documents
.zip file containing 63
individual documents
Updated May 2 @ 3:00pm 
pdf
 Electrical As-Builts 
     for Reference Only 

VENTURA COUNTY COMMUNITY COLLEGE DISTRICT
NOTICE TO CONTRACTORS CALLING FOR BIDS PROJECT #39117:
G BUILDING AT VENTURA COLLEGE:
SUPPLEMENTAL ELECTRICAL WORK AND DESIGN ELEMENTS

NOTICE IS HEREBY GIVEN that the above-named California Community College District, acting by and through its Board of Trustees, hereinafter referred to as the "District" will receive up to, but not later than 3 p.m. on Thursday, May 2, 2013Thursday, May 16, 2013, sealed bid proposals for the award of a contract for Project #39117: G Building at Ventura College: Supplemental Electrical Work and Design Elements.

The scope of the project will include demolition of existing lights and pole bases, cast in place reinforced concrete for light pole bases and mow strips, installation of new exterior lights and poles, and new or reconnection of power to the lights.

A mandatory job walk will begin at 2:00 p.m. on Thursday, April 11, 2013.   A non-mandatory job walk will begin at 2:00 p.m. on Wednesday, April 24, 2013.  Bidders are to meet in the Heery construction trailer located on the grass between the Sciences/Mathematics building and the Library at Ventura College, 4667 Telegraph Rd., Ventura, CA.

All bid proposals shall be submitted on forms furnished by the District. Bids shall be received at Ventura County Community College District, 255 W. Stanley, Suite 150, Ventura, CA 93001, (805) 652-5500. Each bid proposal shall be accompanied by: (a) the required bid security; (b) subcontractors list; (c) non-collusion affidavit; and (d) statement of bidder's qualifications. Bids will be opened and publicly read at the stated time and place.

Bid proposals must conform with, and be responsive to, the bid and contract documents, which will be available at Cybercopy USA, 3020 Sherwin Avenue, Ventura, CA93003, (805) 642-3292 or www.cybercopyusa.com. Plans and Specifications will not be provided at the time of the job walk.

Each bid proposal shall be accompanied by bid security and in an amount not less than ten percent (10%) of the maximum amount of the bid proposal, inclusive of any additive alternate bid item(s). Failure of any bid proposal to be accompanied by the required bid security shall render such bid proposal to be non-responsive and rejected. The owner reserves the right to reject any or all bid proposals or to waive any irregularities or informalities in any bid proposal or in the bidding.

Pursuant to Public Contract Code §3300, bidder must possess a current California Contractors Class B License at the time that the contract for the work is awarded.

Prevailing Wage Rates; Employment of Apprentices. This project is subject to the provisions of Labor Code §§1720 et seq. and regulations set forth in Title 8 §§16000 et seq. of the California Code of Regulations, which govern the payment of prevailing wages on public works projects. All bidders shall be governed by and required to comply with these statutes and regulations in connection with this project. Pursuant to Labor Code §1771, the contractor receiving award of the contract and subcontractors of any tier shall pay not less than the prevailing wage rates to all workers employed in the execution of the contract. Bidders shall comply with applicable statutes and regulations, including but not limited to Labor Code §§ 1771, 1775, 1777.5, 1813 and 1815.

The District has initiated a Labor Compliance Program ("LCP") pursuant to provisions of Labor Code 1771.5 and other applicable law. The Contractor and Subcontractors of any tier shall comply with the LCP initiated and enforced by the District. For inquiries, questions or assistance with regard to the LCP, call Golden State Labor Compliance.

Bid proposals shall not be withdrawn by any bidder for a period of ninety (90) days after the opening of bid proposals. During this time, all bidders shall guarantee prices quoted in their respective bid proposals. In accordance with the provisions of California Public Contract Code §22300, substitution of eligible and equivalent securities for any monies to ensure performance under the contract will be permitted at the request and expense of the contractor.

Estimated Construction Cost: $70,000.00

Gary Kuppenbender, Heery International, (805) 654-6442